Oil boiler replaced by a new anthracite Vaillant heat pump.
This Tattenhall project moved the home away from oil with a 7kW Vaillant aroTHERM plus, a compact unvented cylinder and a system that can also provide cooling during warmer weather.

Replace oil heating and keep summer comfort in mind.
The old oil boiler was removed and replaced with an air source heat pump system for the home's heating and hot water. The selected model is also cooling compatible, giving the customer the option to use the system for cooling in summer.
A 7kW heat pump with a compact hot water cylinder.
My HeatPro installed a 7kW Vaillant aroTHERM plus alongside a new 150 litre unvented cylinder. The cylinder, controls and insulated pipework were arranged neatly in the available utility space.
Vaillant's new anthracite outdoor unit.
The darker anthracite casing gives the outdoor unit a more understated appearance against the brickwork, while keeping the familiar aroTHERM plus layout and controls inside the home.
The £9,000 Boiler Upgrade Scheme grant.
Because this project replaced oil at an eligible off-gas-grid property, it could use the £9,000 Boiler Upgrade Scheme grant introduced on 21 July 2026. Eligibility still depends on the property and application, so homeowners should check thecurrent Ofgem guidancebefore relying on the higher grant.
The main parts of this Tattenhall upgrade.
7kW Vaillant aroTHERM plus air source heat pump
New anthracite outdoor unit finish
150 litre unvented hot water cylinder
Heating system designed with summer cooling capability
£9,000 Boiler Upgrade Scheme grant used for this eligible off-gas-grid property
Inside the system and the finished outdoor unit.





Start with the property, the design and current grant rules.
Send over the current heating setup, hot water arrangement, postcode and a few useful photos. My HeatPro can then advise whether a design consultation is the right next step.
Cooling needs to be designed properly too.
A cooling-compatible heat pump is only one part of the answer. The emitters, controls and intended rooms still need checking before cooling is included in a final design.